The GHS Children’s Hospital leaders selected Forbo linoleum as a key flooring material for this high-profile project. One key driver in selecting the linoleum is the fact that it is naturally anti-microbial. Bonitz supported this project beginning early in the design process and worked closely with the manufacturer, Design Strategies, and the owner to provide budgeting, support research efforts, and a test installation with different seam treatments and finishes. In the final solution, Bonitz heatwelded the seams and applied a specialty coating for easier maintenance and protection. The final design did require some patterns to be installed on a curve and merge at intersections. This project is featured in several publications.